Frozen Canonical Bundle · B3 (BDL-03)

B3: Physical No-RF / Non-DG Industrial Edge Vision Kit

RK3588 NPU fanless box with unpopulated RF pads + supercapacitor NTP RTC (no CR2032 lithium cell) + high-flex PoE+ camera harness + DIN PSU.

Indicative FOB / FCA Hong Kong Band$2,650 – $5,400
Reference Multi-Node Pack$4,950 (6-Layer Turnkey Vision Cell Kit)
Consolidated Lead Time8–10 business days (pre-flashed & burn-in verified in Hong Kong)
Approved Incoterms 2020FCA_HK · FOB_HK_SEA · DAP_BUYER_IOR
Open in BOM Configurator (/configurator/?bundle=B3) Request Shipment-Specific Quote (/rfq/?item=B3) Global Direct RFQ (/rfq/?item=B3)

Engineering Rationale & Cross-Factory Consolidation Advantage

Industrial automation and machine vision integrators shipping edge AI controllers across borders face two chronic customs bottlenecks: multi-month wireless type-approval holds (CE RED, TELEC, SIRIM, SDPPI, FCC) triggered by onboard Wi-Fi/Bluetooth modules, and Class 9 / UN3091 dangerous-goods air-cargo embargoes caused by a single $0.20 CR2032 lithium metal RTC coin cell.

Bundle B3 eliminates both barriers at the factory PCB assembly line. The RK3588 (6 TOPS NPU) industrial edge box is manufactured with physically unpopulated Wi-Fi/BT/cellular solder pads (No-RF) and replaces the CR2032 coin cell with a supercapacitor circuit paired with NTP network time synchronization (Non-DG), bundled with high-flex GigE PoE+ camera harnesses, DIN-rail UL/CE power supplies, and a pre-flashed Ubuntu 22.04 + ROS2 image.

Canonical Bill of Materials (Consolidated 4–5 Factory Kitting)

Canonical SKU Kit Qty Component Specification & Compliance Scope
GO-SKU-182xRK3588 (16GB LPDDR4X + 128GB eMMC, 6 TOPS NPU) Fanless Industrial Edge Box with 4x Independent GbE PoE+ Ports & 12V–36V Wide DC Input
GO-SKU-171xRK3588 (8GB + 64GB) Industrial Gateway Node with Isolated RS232/RS485/CAN — Factory Unpopulated Wi-Fi/BT/Cellular Pads (No-RF) & Supercap NTP RTC (Non-DG)
GO-SKU-064xIndustrial High-Flex GigE PoE+ M12 X-Coded / RJ45 Thumbscrew Camera Drag-Chain Harness (5m, oil-resistant PUR jacket, >= 5 million flex cycles)
GO-SKU-122xIndustrial Area-Scan / 3D ToF Vision Sensor Mounting Bracket + Hardware Trigger Opto-Isolated I/O Breakout Terminal Block
GO-SKU-152x240W 24V DC DIN-Rail Industrial Power Supply (UL 62368-1 / CB / CE certified) + Surge-Protected Terminal Whip

Mandatory Pre-Shipment Verification & Compliance Dossier

NO_RF_DECLARATION + EMC_VARIANT_DECL

Factory physical PCB inspection photo & declaration confirming unpopulated M.2/SMD RF pads ('radio approval not applicable — no radio fitted')

NON_DG_DECLARATION

Factory verification of CR2032 lithium coin-cell removal and supercapacitor + NTP time-sync configuration (exempt from IATA PI 970 / UN3091)

QC_PACK

48-hour continuous NPU stress test log, PoE+ 802.3at load report, and SHA-256 checksum of pre-flashed Linux/ROS2 image

Commercial Rules, Freight Volumetric Basis & NRE Options

Incoterms 2020 & Importer of Record

Available under FCA_HK (Hong Kong Air/Courier Consolidation), FOB_HK_SEA (Ocean Freight), and DAP_BUYER_IOR (Delivered to Buyer Facility; Buyer clears import customs). Unmodified factory Certificates of Origin and compliance reports accompany every Proforma Invoice.

Prepaid Engineering NRE Options

L2 ($1,500–$2,000) Custom Ubuntu 22.04 / ROS2 Humble Image Pre-Flash, Device-Tree Pinout Lock & 48h Thermal Burn-In. Minimum order value USD $5,000 (or USD $2,000–$4,999 trial lot with +$300 kitting handling fee); 7-day quote lock.

Volumetric Freight & Kwun Tong 3PL SLA

Zero UN3091 lithium metal battery hold and zero RED/TELEC/SIRIM wireless licensing hold via physical factory de-population. Optional Kwun Tong 3PL advance-replacement spare pool SLA: 72h (+12%/yr), 48h (+15%/yr), or 24h (+18%/yr).

Technical & Procurement FAQ

Why is physical PCB de-population (No-RF) superior to disabling Wi-Fi/Bluetooth in BIOS or software?

Customs authorities in the EU, ASEAN, Japan, and the Middle East regulate hardware capability rather than software state. Physically omitting the RF module and antenna pads on the PCB—backed by a factory internal photo and EMC Variant Declaration ('radio approval not applicable — no radio fitted')—cleanly exempts the unit from wireless telecom licensing.

How does the Non-DG modification maintain accurate system time without a CR2032 lithium coin cell?

The RTC coin-cell holder is left unpopulated or removed at the factory, eliminating IATA PI 970 Section II / UN3091 lithium metal air-freight restrictions. Short power Ride-Through is handled by an onboard supercapacitor while the pre-flashed Ubuntu 22.04 OS synchronizes clock state automatically via local or enterprise NTP servers on boot.

Can Bundle B3 directly power and trigger industrial area-scan or 3D ToF cameras?

Yes. The primary RK3588 node provides 4 independent IEEE 802.3at PoE+ gigabit ports alongside opto-isolated DIO/RS485 trigger terminals and 5-million-cycle oil-resistant PUR drag-chain cables with thumbscrew RJ45 or M12 connectors.

What burn-in and software readiness checks are performed before dispatch from Hong Kong?

Under L2 NRE, our Hong Kong technical center flashes your exact Ubuntu 22.04 / ROS2 Humble image, locks the device-tree pinout, executes a 48-hour continuous NPU + PoE+ thermal load burn-in, and issues a SHA-256 firmware verification certificate.