Cost guides

Total-cost-of-ownership and landed-cost studies for batteries, solar and EV equipment imported from China.

This library lets engineering, finance, and procurement teams screen equipment-anchored B2B total-cost-of-ownership (TCO) and landed-cost scenarios before issuing a binding request for quotation (RFQ). Each study models a specific Chinese-origin hardware configuration across four equipment classes: stationary LFP battery energy storage systems (BESS) from 15.4 kWh racks to 10 MWh liquid-cooled containers, solar PV arrays from 6.3 kWp carports to 8 MWp industrial plants, on-grid string and solar-plus-storage hybrid inverters from 8 kW to 350 kW, and commercial AC/DC EV charging depots from 4 to 100 ports. Rather than publishing optimistic marketing projections, Tradvolt reports both positive-NPV benchmarks—such as a 2 MWh China-to-Germany datacenter BESS at $0.1144/kWh LCOS or a 100-port MEA EVSE depot achieving a 1.21-year simple payback—and negative-NPV screening alerts, including a 10 MWh Southeast Asia datacenter backup BESS at -$2.74M NPV and a 2 MWp Indian convention center rooftop PV array at INR -753.5M NPV. Comparing these computed cash flows helps buyers isolate which site-specific levers—tariff spread, daily cycling or port utilisation, discount rate (WACC), or CIF/DDP landed CapEx—must clear before committing capital.

Start here: flagship studies & method notes

Browse by buyer decision

1. Stationary LFP battery & BESS projects (15 kWh to 10 MWh)

Screen LCOS, Year-7 augmentation reserves, round-trip efficiency, and backup vs. arbitrage NPV across rack, cabinet, and containerised storage.

2. Utility ground-mount, agrivoltaic & C&I rooftop solar PV (6.3 kWp to 5 MWp)

Benchmark 25-year LCOE, specific yield sensitivity, module degradation, and tariff escalation across bifacial N-type and back-contact PV modules.

Browse the cost studies below.

Frequently asked questions about Tradvolt TCO studies

1. Are the NPV, payback, and LCOE/LCOS figures in Tradvolt TCO studies binding price quotes?

No. Every study in the Tradvolt library is an illustrative scenario model built from named OEM reference equipment, cited public benchmarks, and explicit bounded defaults at a stated evidence date. Customs duties and import VAT/GST lines are frequently marked PENDING for confirmation against national tariff portals (such as EU TARIC, USITC HTS, CBIC ICEGATE, or GRA). Buyers should submit an RFQ to obtain a binding commercial quotation for their specific Incoterm, routing, and certification scope.

2. Why do several Tradvolt TCO studies publish negative NPV results?

Tradvolt publishes unvarnished scenario outputs rather than promotional projections. When a battery or solar project is evaluated strictly on single-stream grid-arbitrage or low commercial tariffs at an 8%–10% discount rate—such as the 10 MWh Southeast Asia datacenter BESS (NPV -$2.74M) or the 2 MWp Indian convention center rooftop PV study (NPV INR -753.5M)—and unquantified co-benefits like avoided outage penalties, diesel backup displacement, or demand-charge shaving are excluded, the baseline cash flow does not recover capital. Publishing negative screens shows procurement teams exactly how much tariff spread, CapEx, or WACC must move before releasing a tender.

3. How are LCOE, LCOS, and EV TCO/km defined across the study library?

Across the library, Levelised Cost of Energy (LCOE) for solar PV and inverters and Levelised Cost of Storage (LCOS) for stationary LFP batteries divide the present value of discounted lifecycle costs by the present value of discounted energy generated or discharged over the analysis horizon (10 to 25 years), keeping the time basis consistent with NPV. For EV charging and fleet electrification studies, TCO per kilometre compares total lifecycle EV capital, charging energy, and maintenance cost per km against an internal-combustion (ICE) diesel or petrol baseline (see Cost modelling methods).

4. What should a buyer replace when converting a reference TCO study into a live RFQ?

Before making a procurement commitment, replace bounded scenario defaults with five project-specific inputs: (1) a live OEM or Tradvolt quote for the exact model, BoM, and Incoterm (EXW, FOB, CIF, DAP, or DDP); (2) verified 8- or 10-digit HS classification, customs duty, and VAT rates from a licensed customs broker; (3) site-specific solar yield (P50/P90), battery duty cycle, or EVSE port utilisation; (4) local utility interconnection, transformer make-ready, and EPC installation quotes; and (5) shipment-specific test certificates (such as IEC 62619, UN 38.3, IEC 61215, IEC 62109, or IEC 61851-1) matched to the current manual revision.